Blocks Brief

Chinese President Xi Jinping visited the western artificial island of the Shenzhen–Zhongshan Link in Zhongshan, Guangdong province, on November 16, 2026, to inspect the cross-sea route’s construction and operation, Xinhua reported on November 17.

The roughly 24-kilometre link opened for trial operation on June 30, 2024, after seven years of construction. It connects Shenzhen on the eastern side of the Pearl River estuary with Zhongshan and Guangzhou’s Nansha district to the west. When it opened, Xi called for the route to be managed and used safely and efficiently to support closer connections between the two sides of the estuary.

According to Xinhua, the link has shortened the drive between Shenzhen and Zhongshan from about two hours to about 30 minutes. The report said cumulative vehicle traffic had exceeded 81 million trips by the time of publication. During the 2026 May Day holiday, daily traffic surpassed 190,000 vehicles for the first time. It cited an estimate that the route reduces vehicle detours by more than 2 billion kilometres each year.

The report also described cross-city public services. It said buses between Shenzhen and Zhongshan had made a cumulative 275,000 departures across the two cities and carried 7.57 million passengers. About 800 government services were available across Shenzhen and Zhongshan, while more than 1,200 were available across the Greater Bay Area. The link’s western artificial island began a tourism trial in October 2025.

Further reading